Design Vault Ep. 3 Front + York with Michelle Wagner
ABOUT THE ARCHITECT:
|
Michelle Wagner is a Project Director at MA | MorrisAdjmiArchitects. Withmore than 25 years of experience as an architect, she excels in themanagement of large-scale projects and has played a vital role in leading thedesign and delivery of some of the firm’s most ambitious assignments. Mostrecently, this includes the delivery of Front & York, a 1.2 million-square-footmixed-use multifamily complex in Brooklyn, NY. The large-scale, two-towerdevelopment occupies an entire city block and encompasses a unique blendof apartments, condos, and luxury penthouses, as well as an unparalleledpackage of indoor and outdoor amenities and more than 140,000 squarefeet of retail. Before joining MA, Michelle worked on the World Trade CenterMaster Plan and Design Guidelines with Studio Daniel Libeskind. Michellereceived a Bachelor of Environmental Design from the University of Coloradoand is a Registered Architect, licensed in New York and Colorado. |
---|
ABOUT THE PROJECT:
Informed by the past but designed for the future, Front & York adapts Dumbo's historic warehouse aesthetic at agrand scale with a contemporary residential reinterpretation.The Manhattan Bridge is the spine of the Dumbo Historic District. Its monumental stone anchor is as essential tolocalcharacter as brick warehouses and Belgian-block streets. Front & York is a new multifamily developmentinspired by the evolution of this post-industrial context. Like the bridge’s stone anchor, it is a bold contribution to theurban fabric that is emblematic of the neighborhood.The new1,200,000-square-foot building occupies a full city block, but thoughtful massing reduces its perceived size.All four facades are pulled back 15 feet from the property line to create a generous new pedestrian zone lined withmore than 140,000 square feet of retail.Continuing to recall the Manhattan Bridge, storefronts are framed with a highly customized system ofblue steelarches and industrial-inspired entry canopies featuring corrugated glass. Above, theresidential levels of the buildingare clad in acustom gray engobebrick, hand-laid and organizedinto a grid by a glass-fiber reinforced concrete“Superframe” that helps the facade read from afar.More than 2,500factory-style divided light windows providepanoramic views of Lower Manhattan, DowntownBrooklyn, and the multi-tiered courtyard at the building’s core—the largest private park in Dumbo.Within, every detail was considered. The building’s condos and apartments feature 10-foot ceilings,chevron-patterned white oak flooring, and custom millwork, fixtures, and finishes throughout.Offering one of New York City's largest and most comprehensive amenity collections, Front & York providesresidents with access to nearly 100,000 square feet of leisure and lifestyle spaces. To create a club-likeexperience for residents, most amenities are co-located on “Level Eight” within two wings linked by alandscaped wrap-around terrace featuring two outdoor pools, cabanas and outdoor kitchen space, anoutdoor screening area, and an outdoor fireplace.
Front + York
Michelle Wagner, Morris Adjmi Architects
See MoreTRANSCRIPT
00;00;00;00 - 00;00;05;22
Doug Patt
Let's go inside the vault. The Design Vault.
00;00;05;25 - 00;00;20;17
Michelle Wagner
One of the nice things about the site is it's next to the landmark districts. So the heights to the north are low and set, and they won't go any higher. So we knew we wanted to be tall and get as many apartments above that height for views to Manhattan.
00;00;20;20 - 00;02;15;29
DP
This is my guest, Michelle Wagner. I'll share more about her shortly. In this episode from the Design Vault we’ll highlight Michelle's project Front and York. Front and York is a 1.2 million square foot mixed use and multi-family complex in Brooklyn, New York. The large scale two tower development occupies an entire city block and encompasses a unique blend of apartments, condos, and luxury penthouses, as well as an unparalleled package of indoor and outdoor amenities, and more than 140,000 square feet of retail.
The project features a blend of more than 750 condo and rental units, as well as an interior courtyard that spans nearly one acre. Not to mention a challenging 25-foot grade change across the site. The building resembles that of a late 19th or early 20th century warehouse or factory, but significantly more luxuriant. With a glass fiber reinforced concrete frame and light gray brick infill, the building is quite beautiful and absolutely massive.
Hi, I'm Doug Pat and this is Design Vault. Today we're talking to Michelle Wagner, registered architect, LEED AP. Michelle has her Bachelor of Environmental Design from the University of Colorado and is a registered architect licensed in New York and Colorado. Michelle is a project director at Morris Adjmi Architects. Before joining Morris Adjmi, Michelle worked on the World Trade Center Master Plan and design guidelines with studio Daniel Libeskind.
With more than 25 years of experience, she excels in the management of large-scale projects and has played a vital role in leading the design and delivery of some of the firm's most ambitious assignments. So, let's get into the details. Welcome, Michelle.
00;02;16;03 - 00;02;18;08
MW
Thank you, Doug. Thanks for that introduction.
00;02;18;12 - 00;02;26;08
DP
So first, tell us a little bit about Morris Adjmi Architects. Where are they located in New York. What's the size of the firm and what type of work do you do?
00;02;26;16 - 00;02;49;29
MW
Sure. We are in lower Manhattan, downtown, really. Right near the stock exchange. It's about a 100 person firm in New York. We also have a small office in New Orleans, about maybe a dozen people now. And that's where Morris grew up, actually. So he still has a home there and family there. And that office covers a lot of our work that's in the South now as we really branched out.
00;02;49;29 - 00;02;57;23
MW
We started as a very New York based firm in 1997. Do you want me to go ahead and tell the story of Morris's origin story?
00;02;57;24 - 00;02;59;13
DP
Yeah, sure. I'd love to hear it. Absolutely.
00;02;59;15 - 00;03;25;27
MW
OK. He was working with Aldo Rossi in Italy. He speaks Italian and he became kind of Aldo Rossi's right hand man in New York when he got the commission of the Scholastic Building in Soho, which you probably know. It's kind of a very modern, but fitting into that historical context very well, right next to the Little Singer building, which is a very famous piece of architecture we all probably learned about an architectural history class.
00;03;25;27 - 00;03;36;29
MW
So Aldo was tragically killed in a car accident in the nineties, and Morris finished that project for him and kept the office going and started his office from there.
00;03;37;06 - 00;03;39;23
DP
Wow. So what kind of work do you guys do today?
00;03;40;00 - 00;04;00;04
MW
We really focused on multifamily, office, hospitality work, our core. We also have art services and interior design, so we really try to deliver all of those services whenever we can. We also have a guy that focuses on urban design, so we've got some multi parcel experience in master planning as well.
00;04;00;07 - 00;04;03;21
DP
Wow. So, a comprehensive list of services that you guys offer.
00;04;03;24 - 00;04;04;26
MW
Absolutely.
00;04;04;29 - 00;04;11;08
DP
So, tell us a little bit about yourself. How did you end up at Morris Adjmi? How long have you been there and what's your role in the office?
00;04;11;10 - 00;04;49;02
MW
I came to New York originally to work on the World Trade Center Master Plan with Daniel Libeskind, which - with my husband - which was really supposed to be a six-month contract. And we've been in New York for 20 years now. So that's the way things go. After that, I really enjoyed the experience of working on large scale master planning projects.
So, I went to another firm for a while that focused on master planning and architecture. And then through a friend that I met at that firm, I just heard about this great architect, Morris, and I started to look at the work and I got invited for an interview and that was seven years ago, and I haven't looked back.
00;04;49;04 - 00;04;51;06
DP
Oh, that's so great. So, you're clearly enjoying it.
00;04;51;06 - 00;04;52;16
MW
Very happy there. Yeah.
00;04;52;18 - 00;05;00;12
DP
So, let's dig in here and talk a little bit about our building. Tell us about the Front and York project. So how did your office get the project?
00;05;00;14 - 00;05;14;08
MW
It was an invited competition. It was LIVWRK and CIM. There were three or four architects, I think. Bjarke Ingels was one of them... ODA. So, we all had a charrette. It was paid, but you know, not a lot.
00;05;14;10 - 00;05;15;13
DP
Sure. Of course.
00;05;15;15 - 00;05;28;02
MW
It was a lot of excitement around this competition because it was a big, big block. And you just don't get projects this big in the city very often. So, a lot of effort went in, and we won. So that was great.
00;05;28;05 - 00;05;35;20
DP
So just as an aside, are there a lot of competitions like that in New York that firms like yours or firms that are your size try to get?
00;05;35;25 - 00;05;51;04
MW
We're often invited to competitions where they've already kind of pre-selected architects and asked to participate. And of course, it's optional if you want to do that, because you know when you're going in for a competition that you're going to put a lot of effort in really to win that project.
00;05;51;12 - 00;05;53;16
DP
And how many firms do you usually compete against?
00;05;53;22 - 00;06;11;09
MW
We don't always know, honestly. At the time, sometimes it's a blind, so we don't really know. And then we try to find out, with some difficulty. But, you know, three or four small group, I think if it was a large number, we'd be less interested. Yeah, because you got to feel like there's a good chance.
00;06;11;11 - 00;06;14;07
DP
That's great. And how long does that process take?
00;06;14;13 - 00;06;15;13
MW
Usually, six weeks.
00;06;15;22 - 00;06;18;27
DP
So, you have six weeks to complete the project. And then...
00;06;18;27 - 00;06;20;00
MW
A concept design.
00;06;20;00 - 00;06;29;00
DP
The concept design. Okay. And then they pick somebody. Well, that's going to be challenging to like scheduling projects in the office. Are we going to get this one or are we going to get that one?
00;06;29;02 - 00;06;42;16
MW
Oh, yeah. Well, that's a lot of what I do now as a director. A lot of the scheduling. When I worked on Front and York, I was the project manager, so it was really about the project but have been elevated to director. So, it really is more about scheduling and staffing.
00;06;42;17 - 00;06;44;17
DP
I bet, with all those people.
00;06;44;17 - 00;06;45;05
MW
Yeah.
00;06;45;07 - 00;06;54;03
DP
So, tell us a little bit about Front and York. So, tell us some of the history of the location of Front and York and then how did that impact the design?
00;06;54;05 - 00;07;03;07
MW
So, the location is a full city block in Dumbo and it was formerly a lead factory and so there was contamination on site.
00;07;03;07 - 00;07;04;09
DP
I can only imagine.
00;07;04;09 - 00;07;23;12
MW
Yeah. And I think maybe that's why it sat vacant since the eighties. I think maybe it was a private parking lot and fenced for decades. So, you know, it really needed a big development like this to afford to clean off the site because really, we remediated like 50 feet of soils in some areas.
00;07;23;12 - 00;07;24;07
DP
50 feet?!
00;07;24;09 - 00;07;38;14
MW
Yeah. So, all of the contaminated soils were dealt with, some carted away somewhere, cleaned on the site under supervision of AKRF, our environmental engineer. So, it really took a big project like this to kind of utilize that site.
00;07;38;16 - 00;07;41;08
DP
Was the area around the site already well developed or...
00;07;41;10 - 00;07;49;01
MW
It was. There were already towers around the site. 100 J Next door was a tall tower. I don't know. It's probably 20 years old at least.
00;07;49;04 - 00;07;59;09
DP
So, what were the client's programmatic requirements? You guys won the competition and they said, okay, this is what we need. Or you already knew that because you had entered the earlier competition and won it.
00;07;59;11 - 00;08;14;27
MW
Yeah, they came with a residential program, mixed use. They already knew what they wanted the program to be, of course. We weren't sure how we were going to handle the middle of the block because it is an extra-large block. So, some of our early options had a road in the middle.
00;08;14;28 - 00;08;15;16
DP
Oh, wow.
00;08;15;20 - 00;08;54;17
MW
One thing they really wanted; they wanted cars to be thought of as part of the site. Whether we drove up with a big turnaround in the middle, like the Antwerp, I think it's got a big turnaround in the middle. So, we looked at that. At the end of the day, we decided that the center of the block really should be a park and it would bring the value up for all the interior apartments as well as the street side.
One of the nice things about the site is it's next to the landmark district. So, the heights to the north are low and set and they won't go any higher. So, we knew we wanted to be tall and get as many apartments above that height for views to Manhattan.
00;08;54;19 - 00;09;03;02
DP
For those of you who are listening, should take a look at the site plan and the floor plan because it really is quite beautiful with almost like a park-like feature right in the middle.
00;09;03;06 - 00;09;22;21
MW
Yeah. As you mentioned, in the beginning, there's a massive park. It's like almost the size of a football field. It's for all the residents. We have a mixture of apartments and condos, front York, but everybody can access the park and even there's a lifetime fitness there as well. And they have some access to that park.
00;09;22;26 - 00;09;35;03
DP
Oh wow, that's so great. So, I know there's something unique about the site, right? There's a change in topography. So, when you guys first went out there and looked at that, am I correct, it was 25 feet approximately.
00;09;35;08 - 00;09;35;27
MW
About 20.
00;09;35;28 - 00;09;47;23
DP
So that's a big deal for a lot. That is as big as this one. You have to start to think about this going to be a really big building. Where do we enter? What floor we entering? How did you guys deal with that?
00;09;47;25 - 00;10;09;24
MW
It was a real challenge and of course we had to look at many iterations on how to deal with that. One thing we did know is that we wanted the condo lobbies really to see through to the park, and the condos are sited on opposite corners of the site. So, there's a big grade change from the lobby floors on each corner, like 20 feet.
00;10;09;29 - 00;10;24;04
MW
But we wanted to see that park. So, you know, eventually what we came up with was really like rolling hills in the park. I think when you go there, you'll notice it's very kind of hilly and there's a lot of winding path and it feels very organic and natural.
00;10;24;08 - 00;10;33;20
DP
Not like a city. So, tell me a little bit about the zoning ordinances there. You said you guys could be taller than buildings that were nearby. How is that even possible? And what were your restrictions.
00;10;33;23 - 00;10;57;02
MW
Actually, we are an as of right project. We did not apply for any variances. That was part of the directive from the beginning. We didn't want to wait for that. It can take months to get a ULURP or a zoning amendment here. So, we were as of right. So, we just maximized the floor area and the height limit and really didn't have to get special approvals.
00;10;57;04 - 00;10;58;24
DP
Interesting. So that's kind of nice.
00;10;59;02 - 00;10;59;22
MW
Yeah.
00;10;59;29 - 00;11;05;07
DP
Right? Walk into a project like that. So, tell us a little bit about the building plan. So, it's like a big donut.
00;11;05;12 - 00;11;31;16
MW
It's a big donut, yeah. With a large park in the middle, there's sort of a lower podium level that's about eight stories and then on opposite corners there's the towers, which are the condo apartments that are 22 stories tall, and those were sited on diagonal corners and also diagonally from another existing tower in the neighborhood, just to maximize view corridors and make sure that we weren't blocking any view corridor.
00;11;31;18 - 00;11;37;06
DP
Did you guys go through a lot of design iterations in terms of where those towers were and how tall the building was?
00;11;37;06 - 00;11;38;01
MW
Absolutely.
00;11;38;02 - 00;11;38;29
DP
A dumb question!
00;11;39;01 - 00;12;07;24
MW
Well, an interesting thing is, though, in our competition, it was similar massing with the two tall towers on the corner, but they told us, okay, that was the competition. Now we're starting over. So, we looked at every possible massing scenario again. And then of course, we ended up back with the towers on the corner. But the big changes, they were more massive. They were bigger towers, more like bars, because they really wanted to have great views in these apartments.
00;12;08;01 - 00;12;25;03
DP
So, style, I said in the intro, it looks a little bit like a factory warehouse building. I mean, it does, but it doesn't, right? I mean, it's incredibly stylistic. Talk a little bit about how you chose the particular style because it's a little traditional and it's still contemporary.
00;12;25;05 - 00;13;03;23
MW
You know, I think we were inspired by all the factory buildings in Dumbo. I mean, that is the period of significance, that early American factory building, which were very large, and they had big factory windows and were usually brick or masonry.
The storefront, you might notice we have a very tall sort of metal, blue metal storefront, and it looks very muscular, almost like structural steel. It's aluminum, but it looks like structural steel that was really inspired by the Manhattan Bridge, which you can see just down the block from both Front and York. You see the structural steel of the bridge.
00;13;03;25 - 00;13;09;05
DP
So, you guys decided from the get go that you were going to make a brick building, right?
00;13;09;07 - 00;13;48;22
MW
We did. We always wanted the brick. We actually looked at this building as precast donuts initially, just really a client directive thinking that was going to be the most economical solution. But even as precast, we wanted that gray brick. I mean, we were really trying to kind of fit into the neighborhood. There's a lot of granite, gray cobblestone in Dumbo and it was a big building, so we wanted something a little recessive and quiet, I think, in the brick color. So, we were looking for that dark gray brick, even when it was a precast building, which ultimately, it's not precast. It’s hand-laid Glen-Gery brick.
00;13;48;25 - 00;13;53;04
DP
So, what are some of the unique construction details that you guys employed here using brick?
00;13;53;25 - 00;14;37;23
MW
Well, the first thing is the brick itself. I mean, we had actually gone pretty far down the road with the precast and had a gray color in mind. But, you know, of course, economics are always a factor. And we couldn't find an economical gray brick that suited us.
So thankfully, we had a great salesperson that told us about, new at the time, custom color Glen-Gery on go clay coating, which is not like a clay coat that's very opaque and solid. It's actually more translucent and we could pick any color that we wanted and it was pretty economical. So that's what we did. We found a beautiful kind of dark, medium gray, very muted, and then a little lighter gray at the penthouse. On the kind of additions on top.
00;14;37;26 - 00;14;48;01
DP
And I'm looking at some really beautiful details here, particularly the recess in between that kind of frames out every one of those windows. Was that a detail that you guys spent a lot of time working on?
00;14;48;01 - 00;15;04;08
MW
Yes, that was actually a detail that we developed when it was precast donuts. And funny enough, we really liked it because it just gave that little bit of detail to the facade that without it, it felt a little bit flat. So that was originally there to hide the precast joint.
00;15;04;08 - 00;15;05;20
DP
Oh my gosh. So, it's a remnant of an earlier design.
00;15;05;20 - 00;15;14;01
MW
It's a remnant of an earlier design. I think at one point the client suggested maybe we should take it off. And we all said that we really like it.
00;15;14;08 - 00;15;16;15
DP
Yeah, it does an awful lot for the facades.
00;15;16;15 - 00;15;23;14
MW
We're going to use it to hide the brick control joint instead. So, that's tucked in there. And that's why you don't see them at the windows.
00;15;23;16 - 00;15;25;01
DP
So the control joints are inside.
00;15;25;03 - 00;15;26;17
MW
There in that reveal to one side.
00;15;26;26 - 00;15;32;05
DP
Oh, I'd love to see a blow-up detail on that. Tell me a little bit about the concrete structural frame.
00;15;32;07 - 00;15;34;18
MW
That's the GFRC. The white frame.
00;15;34;18 - 00;15;35;19
DP
Yes. Is that structural?
00;15;36;08 - 00;15;53;18
MW
Really beautiful. It's not structural, it's trim. This is a concrete building. So yeah, that is a device really to help modulate the scale of the building and also to help it read from a distance. I mean, you can see, actually, you can see that from a plane. I've seen it flying overhead.
00;15;53;19 - 00;15;54;22
DP
Are you serious?
00;15;54;24 - 00;16;12;15
MW
Yeah, it really does help bring down the scale because, you know, could you imagine if you didn't have that trim? I think the white color, it's really kind of neat standing on Front and York and seeing the blue and white bridge just right there and just kind of the colors just feel good. They fit into the neighborhood. There's white on the bridge.
00;16;12;22 - 00;16;17;28
DP
Had you guys looked at doing that in any other color, like gray, having it melt back into the facade?
00;16;18;05 - 00;16;34;02
MW
We study everything. We're very iterative, I think in our process. And you - we always internally look at three options. You know, we really push it and then we narrow down the options for the client usually, but lots of options.
00;16;34;04 - 00;16;38;08
DP
So, did brick solve any particular design challenges for you guys or for the client?
00;16;38;14 - 00;17;10;07
MW
I think the choice to go to brick was just feeling competitively at the time it was cost, but also just the control of knowing that you could go to different masons if you needed to. I think a lot of times there were more than one trade for - I don't know about the brick. I think that was just one mason in the end, but because it was such a big building, they wanted to make sure that there was some duplicity, I guess, of trades being able to work on things. And I think they got nervous about getting all the precast from one place.
00;17;10;14 - 00;17;20;17
DP
Did you guys have any challenges finding a good mason? I mean, I would imagine in New York it's not a big deal, but even in a Westchester County where I do a lot of work, we always have a challenge finding good masons.
00;17;20;17 - 00;17;35;25
MW
The masons were great. Everybody was great. New Line was the CM, New Line Structures. And we worked on this three years in construction. After three years, it was really hard ending construction because we were kind of a big happy family at that point. It was great.
00;17;35;27 - 00;17;44;18
DP
So, into the office I often think about how many people work on a project. How many people were on this team, and how many people did the drawing for the job?
00;17;44;25 - 00;17;50;01
MW
I'd say at least 20 at its peak, when we were in construction documents.
00;17;50;11 - 00;17;53;07
DP
Yeah. Now, did you guys do this in 3D?
00;17;53;10 - 00;18;35;11
MW
Oh, yeah. We did this in Revit. We usually start with Rhino, something very, you know, design-y and flexible and fast. But once you get into Revit, it becomes you're building a building, right. And a computer. So, becomes more cumbersome. But we absolutely did it in Revit. And actually that ended up being tremendously helpful because we use BIM in construction all the way through. That is, New Line did. That's something they like to do and always do. So, they have specialists that can really run Revit and they model in great detail all of the MEP plumbing and electrical systems throughout the building. So, we find clashes in construction on the computer before they ever happen in the field.
00;18;35;14 - 00;18;38;01
DP
How long have you guys been on Revit? Just curious.
00;18;38;03 - 00;19;04;14
MW
I think we transitioned, probably fully by 2018. When I started in 2016, I think we had one or two projects in Revit. Now we're all Revit. I think we're starting to lose people that know how to work in CAD, but we still have a few. Well, because everybody does Revit. So, we really, we can export to CAD and everything, but we just don't have many people drawing in CAD anymore - and doing the layers.
00;19;04;18 - 00;19;13;07
DP
Oh my goodness. Right. That that's how I operate right now. Well, I do both, but I'm on ArchiCAD. Are most of the people in the city on Revit?
00;19;13;14 - 00;19;21;15
MW
I think so. I'm sure there are still people working in CAD, but I think more and more people are going to Revit, especially for big projects.
00;19;21;18 - 00;19;29;18
DP
So, did sustainability ever come up as a factor in choosing brick, for example, color, texture, thermal, code compliance?
00;19;29;21 - 00;20;03;03
MW
This isn't a LEED project, so we didn't consider it for its sustainability, per se. But we did do something at Front and York, which was we qualified for Zone Green, which is a New York City zoning rule, that if you make your exterior wall thicker and heavily insulate it up to 16 inches thick, you actually get a zoning bonus for that. So, we did that. So, these are 16-inch-thick walls with lots of insulation, CMU back up. That's how this is a sustainable project in terms of the brick wall.
00;20;03;08 - 00;20;05;20
DP
So, it's an efficient veneer - it's an efficient facade.
00;20;05;21 - 00;20;22;21
MW
It's a very, yes, efficient façade. Helps with heating and cooling loads. We also won the Big Apple Brownfield Award for environmental protection for the clean-up effort I mentioned. Yeah, 2020. So, cleaning up that site was a very good move for Dumbo.
00;20;22;28 - 00;20;26;20
DP
Just curious, where does all that go? Where does all the land that they've removed...
00;20;26;26 - 00;20;38;12
MW
Sometimes they can actually treat it on site. It depends on - they test certain segments like it's a very involved process. If it's very, very bad then there are places out west that will accept it.
00;20;38;12 - 00;20;38;28
DP
Okay.
00;20;39;01 - 00;20;54;09
MW
If it's not, that can be landfill like for other projects that can be cleaned and kept local. So, the good fill was - actually like people would come, they put a call out and people would come if they needed fill for their construction projects and they'd cart it away.
00;20;54;14 - 00;20;59;09
DP
Yeah. Interesting. So, I'm thinking here, do we see any masonry on the interior?
00;20;59;13 - 00;21;08;27
MW
We do a little bit up on the eighth floor and amenities. We have some sort of indoor-outdoor fireplaces that have brick. So yeah, there's a little bit.
00;21;09;04 - 00;21;18;10
DP
That’s great. So did your team learn anything interesting through the design and construction process, something maybe that you guys hadn't been through in the past?
00;21;18;13 - 00;22;15;18
MW
I would say that one thing that we found very difficult at first was the redlining process in architecture, where the more senior architects will redline drawings and then give them to the junior staff to pick up the changes. That was very difficult with a 20-person team. So that kind of prompted us to find a tool which we eventually found Blue Beam Studio, which now we use on every project in the office where you can go in and do group markups together and highlight together. So, it's one document and you refresh the document periodically. So, we had a lot of logistical challenges like that.
We had to set certain meeting pulses internally to make sure we were communicating. So, we weren't overlapping or ignoring a corner of the building, which you can sometimes do, and it's 1.2 million square feet. I think there were a lot of things we learned internally through this process that actually help us now on some of our larger projects.
00;22;15;26 - 00;22;18;10
DP
How long was it until you guys implemented Blue Beam?
00;22;18;12 - 00;22;25;03
MW
It really like started, I think with Front and York and now the whole office is on it and we really do all of our markups that way.
00;22;25;11 - 00;22;26;08
DP
That's really cool.
00;22;26;10 - 00;22;34;23
MW
QAQC reviews and Blue Beam’s, probably the new CAD, I would say for a lot of us, because it is a very good markup and measuring tool.
00;22;34;29 - 00;22;35;24
DP
Yes.
00;22;35;26 - 00;22;39;02
MW
And it's cloud based or it can be. So, you can work in a big group.
00;22;39;03 - 00;22;40;26
DP
So, you can go in and draw in 2D.
00;22;41;02 - 00;22;41;20
MW
Yep.
00;22;41;22 - 00;22;44;21
DP
Wow, that's pretty cool. We've been using Procore.
00;22;44;28 - 00;22;50;07
MW
Yeah. We also use Procore. New Line Structures did and that was tremendously helpful.
00;22;50;07 - 00;22;53;05
DP
Yeah, for project management, it's been great. Super helpful.
00;22;53;09 - 00;23;20;08
MW
Yeah. And just the process of using Navisworks and Revit is basically - Navisworks is the software that helps you look at Revit and really find those clashes in the field. This was the easiest CA project, maybe not easy for all of the staff, but in terms of the leadership, we weren't running into big problems. It was very smooth. We were finding the problems in the model in the field. So that was great.
00;23;20;11 - 00;23;25;19
DP
How many drawings does a job like this have? Like what does a construction document set look like?
00;23;25;19 - 00;23;27;09
MW
Yeah, I think about 500 drawings.
00;23;27;09 - 00;23;28;00
DP
Oh, my goodness gracious.
00;23;28;03 - 00;23;31;27
MW
Yeah, something like that. Three or four volumes, you know. Lots of trades.
00;23;32;01 - 00;23;34;22
DP
Wow. And construction was three years.
00;23;34;25 - 00;23;35;15
MW
That’s about right.
00;23;35;20 - 00;23;37;19
DP
Wow. So how long has it been complete?
00;23;37;26 - 00;23;44;22
MW
I think it's been complete release since the summer. Last summer? I could be off by a month or two.
00;23;44;29 - 00;23;46;26
DP
Are they happy? Is it full?
00;23;46;29 - 00;23;53;06
MW
I don't know if it's full, but it's very well occupied. I do know that there's 16 penthouses are all sold.
00;23;53;09 - 00;23;54;08
DP
Wow.
00;23;54;13 - 00;24;12;23
MW
The views are spectacular all around. So, I think maybe they wish they built more larger apartments because really when this was landing, I mean, seems like the trend started to go to larger apartments. With COVID and everything. A lot of one-bedrooms, but they're really nice sized one-bedrooms, you know.
00;24;13;00 - 00;24;13;26
DP
Yeah. The photographs are beautiful.
00;24;13;29 - 00;24;28;00
MW
Yeah. And the amenities are - we've had so many developers and other people touring the amenities on the eighth floor. There's 15,000 square feet of amenities up there and they're spectacular. And a couple of swimming pools.
00;24;28;03 - 00;24;28;25
DP
Oh, my gosh.
00;24;28;26 - 00;24;31;13
MW
On the roof. I think that's a real selling point.
00;24;31;15 - 00;24;39;12
DP
So, one last question before you go. Personal question, What's your favorite part of the job and what's your least favorite part of the job as an architect?
00;24;39;14 - 00;25;01;17
MW
Well, I like to solve problems with teams. I really like large projects because you get to work with large teams and it's just really fun. We have a lot of people that we have a lunchroom at, at MA and we have people that sit around and do the New York Times crossword puzzle together every day, and we just like solving problems together. So that's my favorite part.
00;25;01;24 - 00;25;05;05
DP
Yeah, that's great. You don't have to tell me what you don't like.
00;25;05;07 - 00;25;10;04
MW
What I don't like, I think would be obvious, which is the stress and the headaches. And, you know...
00;25;10;04 - 00;25;13;09
DP
Yes. I can only imagine on projects that are this big.
00;25;13;09 - 00;25;18;24
MW
Right. Running into things that you didn't expect in the field. Those are the things that I like the least.
00;25;18;24 - 00;25;23;10
DP
Yeah. My boss used to say, “it's always the thing you don't see coming that gets you.”
00;25;23;11 - 00;25;24;03
MW
That's right.
00;25;24;03 - 00;25;37;09
DP
It really is. It's not the stuff you worry about all the time. It's the one thing you just never saw coming. Well, Michelle Wagner, thank you very much for your time today. Where can people go to find out more about you and Morris Adjmi Architects?
00;25;37;12 - 00;25;40;14
MW
I’d suggest our website, which is ma.com
00;25;40;16 - 00;25;50;01
DP
All right. You got it. Well, super simple. And thank you very much. It's been great. Front and York’s gorgeous. Thank you very much.
You May Also Be Interested In
We Can Help With Your Next Project
Discover the latest + greatest in design trends, industry news & pro tips from pros.
For all of your project needs, you’ll find everything you need at a Supply Center.
Let Us Know How We Can Help!